What is to be done with the existing underground storm water piping at the Veterinary Center?

Prepare for the IEC Year 2 Part 1 Test. Use flashcards and multiple choice questions with hints and explanations. Get exam-ready!

Selecting to abandon the existing underground storm water piping at the Veterinary Center means that the piping system will no longer be used for its intended purpose, but it will be left in place rather than physically removed. This decision can be based on several factors, such as the structural integrity of the piping, potential costs associated with removal, or the decision to replace the system with a new one that operates more effectively.

Leaving the piping in place may also be an option supported by existing regulations or guidelines, which sometimes allow for the abandonment of infrastructure rather than removal, especially if the piping poses no immediate risk or hazard. This approach can also prevent ground disturbance and other potential issues that can arise with excavation. The abandoned piping might still need to be properly sealed, documented, or capped off to ensure it does not create problems in the future.

In contrast, repairing, relocating, or removing the piping would involve additional labor, costs, and potential disruption to the site, making abandonment a practical solution depending on the overall project requirements and budget constraints.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy